How to level a subfloor for a hardwood floor install.
Leveling concrete floor for engineered hardwood.
A floating engineered wood flooring installation on concrete can be an excellent choice if your subfloor is below grade.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
Whether you re going on to install hardwood ceramic tile or laminate one of the most important steps of any flooring project is making sure the subfloor foundation is level.
The misconception is that a concrete subfloor must be completely level to install hardwood.
Check your wood flooring manufacturer s recommendations and sand any high spots with a concrete grinder.
Actually the floor must be flat which allows for minor variations in the level.
Use this self leveling concrete for mak.
Self leveling underlayment products can be used on concrete floors wood subfloors that are uneven but still in decent shape and even over ceramic tile floors eliminating the task of tearing.
If you plan on leveling a concrete floor you can do so with relative ease by using a leveling compound.
Typically the floor must be level and uniform within 3 16 inch every 10 feet.
When installing engineered hardwood floors over radiant heated subfloors turn the heat off for 24 hours before during and after installation.
Hardwood floor installers often use the term level when referring to subfloors when actually they are meaning the term flat.
In this video we show you everything you need to know to make perfect level floor using self leveling floor compound.
It s also a great option if you choose to incorporate a radiant heat system don t forget the vapor.
Installing a floating engineered hardwood floor works well at any grade level and over most types of subfloor surfaces.
Use a long level and tape measure to check that the floor is level.
Level floors are critical for reducing gaps between the flooring material and substrate and preventing sagging and other structural complications.