Attach temporary supports a and using 2 wood screws as described below and shown in figures 4 and 5.
Lowes attic stairs installation instructions.
This attic ladder is made for the range of ceiling heights shown on the packaging.
Do not install the attic ladder in a ceiling that has a height outside of this range.
Support a should be located at the end where the door hinge of the ladder will go.
30 in x 56 5 in folding steel attic ladder with 350 lbs.
Installation instructions instrucciones de instalación instructions d installation table of contents page parts and tools 2 before you begin 3 step 1 preparing existing attic ladder opening for installation 4 5 step 2 placing ladder into prepared opening 6 7 step 3 permanent mounting of ladder 8 step 4 setting ladder height 9.
Fire marshal or building department before installing the attic ladder.
Once you re in the attic locate the screw.
The capacity of the attic ladder person plus materials being carried is 250 pounds.
When you find it remove the insulation from the area and determine.
Never place stepladder or person in the path of the attic ladder s climbing section drop down area.
Fakro lmp 30x56 5 steel attic ladder 9 83 ft to 12 ft.
Determine the area where you want to place your stairs.
So stop worrying about how to install an attic ladder and let lowe s coordinate your attic stairs installation.
Altering the attic.
Create a barrier before blowing in your insulation you ll need to create a barrier to keep the insulation from falling into areas where you don t want it like your walkway or down the attic hatch.
The edge of support a should extend into the rough opening 3 8 as shown in figure 5.
Next using an electric drill pop a screw up through the drywall in the ceiling.
Lowe s will coordinate your attic ladder installation service to remove your old attic ladder handle your new attic stair installation and haul away the old unit.
Install pieces of wood or rulers at various spots around the attic to gauge the depth of your insulation as you work.
Make sure both screws penetrate header above ceiling.
The edge of support a should extend into the rough opening 3 8 as shown in figure 5.
Standing on the floor reach up with the pole hook and firmly hook the eye bolt on the attic door and pull to open door.
First locate support a at the end where the door hinge of the ladder will go.
Attach temporary supports a and b with 2 deck screws as shown in figure 4.
Cutting and bracing a new hole.
Position a stepladder to the side of the attic ladder s climbing section drop down area.